Start with the treatment objective.
Multi-stage treatment trains selected for the measured source and required output.
No treatment technology should be selected from appearance alone. Available test results, daily and peak demand, site constraints, intended use and maintenance capacity help define the appropriate configuration.
Design considerations
- Test source water and estimate peak demand.
- Use only the treatment stages required by the objective.
- Plan monitoring, consumables and preventive maintenance.
Final performance depends on verified design inputs, correct installation, operating conditions and scheduled maintenance. Request a water check before making a specification decision.
