Start with the treatment objective.
Physical, chemical and biological stages defined by the actual industrial effluent.
No treatment technology should be selected from appearance alone. Available test results, daily and peak demand, site constraints, intended use and maintenance capacity help define the appropriate configuration.
Design considerations
- Analyze influent variability and pollutant loading.
- Connect unit processes to discharge or reuse objectives.
- Build monitoring and trained operation into the plan.
Final performance depends on verified design inputs, correct installation, operating conditions and scheduled maintenance. Request a water check before making a specification decision.
